Documents
View and download our consultation documents. All consultation materials from both stages of consultation are available below.
Stage two virtual consultation room – 2025
Stage two consultation materials – 2025
- Stage two consultation information booklet
- Stage two consultation newsletter
- Stage two consultation feedback form (printable version)
- Stage two consultation feedback form (online submission)
- Stage two consultation banners
- Statement of Community Consultation (SoCC)
- Combined Section 47 and 48 notice
- Section 48 notice
Stage two consultation – online information presentation – 2025
- Introduction to Kingsway Solar
- Indicative layout of the development and inter-array areas
- Connecting to the national grid
- Environmental impact assessment
- Community benefits
- The consultation and providing feedback
- Full video
Stage two consultation – Preliminary Environmental Information Report - 2025
PEIR Volume 1
- PEIR Volume 1 Cover, Table of Contents and Glossary
- PEIR Volume 1 Chapter 1 Introduction
- PEIR Volume 1 Chapter 2 Site & Context
- PEIR Volume 1 Chapter 3 The Scheme
- PEIR Volume 1 Chapter 4 Alternatives and Design Evolution
- PEIR Volume 1 Chapter 5 EIA Methodology
PEIR Volume 2
- PEIR Volume 2 Cover, Table of Contents and Glossary
- PEIR Volume 2 Chapter 6 Biodiversity
- PEIR Volume 2 Chapter 7 Landscape and Visual Amenity
- PEIR Volume 2 Chapter 8a Cultural Heritage - Archaeology
- PEIR Volume 2 Chapter 8b Cultural Heritage - Built Heritage
- PEIR Volume 2 Chapter 9 Land and Groundwater Quality
- PEIR Volume 2 Chapter 10 Soils and Agriculture
- PEIR Volume 2 Chapter 11 Traffic and Transport
- PEIR Volume 2 Chapter 12 Noise and Vibration
- PEIR Volume 2 Chapter 13 Air Quality
- PEIR Volume 2 Chapter 14 Socio Economics and Population
- PEIR Volume 2 Chapter 15 Climate Change
- PEIR Volume 2 Chapter 16 Other Environmental Topics
- PEIR Volume 2 Chapter 17 Cumulative Effects Assessment
- PEIR Volume 2 Chapter 18 Summary of Residual Significant Effects
PEIR Volume 3
- PEIR Volume 3 Cover, Table of Contents
- PEIR Volume 3 Figure 1.1 Site Location Plan
- PEIR Volume 3 Figure 1.2 Site Boundary Plan
- PEIR Volume 3 Figure 1.3 Developable Areas and Grid Connection Corridor
- PEIR Volume 3 Figure 2.1 Environmental Sensitivities - Biodiversity (1 of 9)
- PEIR Volume 3 Figure 2.2 Environmental Sensitivities - Biodiversity (2 of 9)
- PEIR Volume 3 Figure 2.3 Environmental Sensitivities - Biodiversity (3 of 9)
- PEIR Volume 3 Figure 2.4 Environmental Sensitivities - Heritage (4 of 9)
- PEIR Volume 3 Figure 2.5 Environmental Sensitivities - Heritage (5 of 9)
- PEIR Volume 3 Figure 2.6 Environmental Sensitivities - Heritage (6 of 9)
- PEIR Volume 3 Figure 2.7 Environmental Sensitivities - Water (7 of 9)
- PEIR Volume 3 Figure 2.8 Environmental Sensitivities - Water (8 of 9)
- PEIR Volume 3 Figure 2.9 Environmental Sensitivities - Water (9 of 9)
- PEIR Volume 3 Figure 3.1 Indicative Locations for the On-Site Substations and BESS Compounds
- PEIR Volume 3 Figure 6.1 Study Areas
- PEIR Volume 3 Figure 6.2 Survey Coverage
- PEIR Volume 3 Figure 6.3 Statutory Designated Sites
- PEIR Volume 3 Figure 6.4 Priority Habitats and Ancient Woodland
- PEIR Volume 3 Figure 6.5 Waterbodies and Watercourses
- PEIR Volume 3 Figure 6.6 Habitat Assessment
- PEIR Volume 3 Figure 7.1 Landscape & Visual Study Area
- PEIR Volume 3 Figure 7.2 Topography Plan
- PEIR Volume 3 Figure 7.3 Planning Designations
- PEIR Volume 3 Figure 7.4 Access Plan
- PEIR Volume 3 Figure 7.5 National Character Area Plan
- PEIR Volume 3 Figure 7.6 Landscape Character Area Plan
- PEIR Volume 3 Figure 7.7 ZTV Plan, Bare Earth Combined Scheme
- PEIR Volume 3 Figure 7.8 ZTV Plan, Screened PV Modules
- PEIR Volume 3 Figure 7.9 ZTV Plan, Screened Substation and Compounds
- PEIR Volume 3 Figure 7.10 ZTV Plan, Screened Inter Array Corridors
- PEIR Volume 3 Figure 7.11 ZTV Plan, Screened Grid Connection Corridor
- PEIR Volume 3 Figure 7.12 ZTV Plan, Screened Combined Scheme
- PEIR Volume 3 Figure 7.13 Viewpoint Location Plan
- PEIR Volume 3 Figure 7.14 Winter Baseline Photography
- PEIR Volume 3 Figure 7.15 Illustrative Landscape Masterplan
- PEIR Volume 3 Figure 8a.1 HER Entries and Scheduled Monuments within Dev Area A and the Inter-Array Zone Between Dev Areas A and B
- PEIR Volume 3 Figure 8a.2 HER Entries within Developable Area B
- PEIR Volume 3 Figure 8a.3 HER entries within Developable Area C
- PEIR Volume 3 Figure 8a.4 Archaeological Zones in Dev Area A Showing Underlying Geophysical Survey Anomalies
- PEIR Volume 3 Figure 8a.5 Archaeological Zones in Dev Area B Showing Underlying Geophysical Survey Anomalies
- PEIR Volume 3 Figure 8a.6 Archaeological Zones in Dev Area C Showing Underlying Geophysical Survey Anomalies
- PEIR Volume 3 Figure 8b.1 Location of Built Heritage Assets - Development Areas A, B and C and Inter-Array
- PEIR Volume 3 Figure 8b.2 Location of Built Heritage Assets – Grid Connection Corridor
- PEIR Volume 3 Figure 10.1 Existing Geology Map
- PEIR Volume 3 Figure 10.2 Soil Association Map
- PEIR Volume 3 Figure 10.4 Provisional Agricultural Land Classification Map
- PEIR Volume 3 Figure 10.5 Previously Accepted Detailed Agricultural Land Classification Map
- PEIR Volume 3 Figure 11.1 Transport Study Area
- PEIR Volume 3 Figure 11.2 Highway Links across the Study Area
- PEIR Volume 3 Figure 11.3 Indicative Access Points and Routes
- PEIR Volume 3 Figure 11.4 Personal Injury Collisions within the Study Area 2020-2025
- PEIR Volume 3 Figure 11.5 Traffic Survey Locations
- PEIR Volume 3 Figure 12.1 Study Area
- PEIR Volume 3 Figure 12.2 Existing Daytime Road Traffic Noise Levels
- PEIR Volume 3 Figure 12.3 Existing Night-time Road Traffic Noise Levels
- PEIR Volume 3 Figure 12.4 Existing Daytime Rail Traffic Noise Levels
- PEIR Volume 3 Figure 12.5 Existing Night-time Rail Traffic Noise Levels
- PEIR Volume 3 Figure 12.6 Potentially Significant Operational Noise Effects
- PEIR Volume 3 Figure 12.7 Residual Significant Operational Noise Effects
- PEIR Volume 3 Figure 13.1 Study Area
- PEIR Volume 3 Figure 13.2 Monitoring Locations
- PEIR Volume 3 Figure 13.3 Current Background Concentrations
- PEIR Volume 3 Figure 13.4 Future Background Concentrations
- PEIR Volume 3 Figure 14.1 Site Context Map
- PEIR Volume 3 Figure 14.2 Construction Labour Market Area (CLMA) Focus Area
- PEIR Volume 3 Figure 14.3 CLMA
- PEIR Volume 3 Figure 14.4 Community Study Area
- PEIR Volume 3 Figure 14.5 Community Facilities (1 of 3)
- PEIR Volume 3 Figure 14.5 Community Facilities (2 of 3)
- PEIR Volume 3 Figure 14.5 Community Facilities (3 of 3)
- PEIR Volume 3 Figure 14.6 PRoW within the Community Study Area (1 of 2)
- PEIR Volume 3 Figure 14.6 PRoW within the Community Study Area (2 of 2)
- PEIR Volume 3 Figure 16.1 EA Flood Map For Planning
PEIR Volume 4
- PEIR Volume 4 Appendix 0 Cover, Table of Contents
- PEIR Volume 4 Appendix 1.1 Statement of Competency
- PEIR Volume 4 Appendix 5.1 Location of Specified Information in the PEIR
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part1
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part2
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part3
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part4
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part5
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part6
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part7
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part8
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part9
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part10
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part11
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part12
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part13
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part14
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part15
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part16
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part17
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part18
- PEIR Volume 4 Appendix 5.2 EIA Scoping Report Part19
- PEIR Volume 4 Appendix 5.3 EIA Scoping Opinion Part1
- PEIR Volume 4 Appendix 5.3 EIA Scoping Opinion Part2
- PEIR Volume 4 Appendix 5.3 EIA Scoping Opinion Part3
- PEIR Volume 4 Appendix 5.3 EIA Scoping Opinion Part4
- PEIR Volume 4 Appendix 5.3 EIA Scoping Opinion Part5
- PEIR Volume 4 Appendix 5.3 EIA Scoping Opinion Part6
- PEIR Volume 4 Appendix 5.3 EIA Scoping Opinion Part7
- PEIR Volume 4 Appendix 5.3 EIA Scoping Opinion Part8
- PEIR Volume 4 Appendix 5.3 EIA Scoping Opinion Part9
- PEIR Volume 4 Appendix 5.4 Scoping Opinion Comment Responses Schedule
- PEIR Volume 4 Appendix 5.5 Long List of Other Plans and Projects
- PEIR Volume 4 Appendix 6.1 Legislation and Poicy
- PEIR Volume 4 Appendix 6.2 Baseline Data Part1
- PEIR Volume 4 Appendix 6.2 Baseline Data Part2
- PEIR Volume 4 Appendix 6.2 Baseline Data Part3
- PEIR Volume 4 Appendix 6.2 Baseline Data Part4
- PEIR Volume 4 Appendix 6.2 Baseline Data Part5
- PEIR Volume 4 Appendix 6.2 Baseline Data Part6
- PEIR Volume 4 Appendix 6.2 Baseline Data Part7
- PEIR Volume 4 Appendix 6.2 Baseline Data Part8
- PEIR Volume 4 Appendix 6.2 Baseline Data Part9
- PEIR Volume 4 Appendix 6.3 Scoping Opinion Responses
- PEIR Volume 4 Appendix 6.4 Assessment Criteria
- PEIR Volume 4 Appendix 6.5 Embedded Mitigation
- PEIR Volume 4 Appendix 7.1 Legislation, Policy and Guidance
- PEIR Volume 4 Appendix 7.2 Scoping Opinion Comments and Responses
- PEIR Volume 4 Appendix 7.3 Landscape Assessment Tables
- PEIR Volume 4 Appendix 7.4 Visual Assessment Tables
- PEIR Volume 4 Appendix 8a.1 Archaeology Desk Based Assessment Part1
- PEIR Volume 4 Appendix 8a.1 Archaeology Desk Based Assessment Part2
- PEIR Volume 4 Appendix 8a.1 Archaeology Desk Based Assessment Part3
- PEIR Volume 4 Appendix 8a.1 Archaeology Desk Based Assessment Part4
- PEIR Volume 4 Appendix 8a.2 Geophysical Survey Report Part1
- PEIR Volume 4 Appendix 8a.2 Geophysical Survey Report Part2
- PEIR Volume 4 Appendix 8a.2 Geophysical Survey Report Part3
- PEIR Volume 4 Appendix 8a.2 Geophysical Survey Report Part4
- PEIR Volume 4 Appendix 8a.2 Geophysical Survey Report Part5
- PEIR Volume 4 Appendix 8a.2 Geophysical Survey Report Part6
- PEIR Volume 4 Appendix 8a.2 Geophysical Survey Report Part7
- PEIR Volume 4 Appendix 8a.2 Geophysical Survey Report Part8
- PEIR Volume 4 Appendix 8a.2 Geophysical Survey Report Part9
- PEIR Volume 4 Appendix 8a.3 Heritage Baseline Tables
- PEIR Volume 4 Appendix 8a.4 Legislation, Policy and Guidance
- PEIR Volume 4 Appendix 8a.5 Scoping Opinion Responses
- PEIR Volume 4 Appendix 8a.6 Archeological Assessment Criteria Heritage
- PEIR Volume 4 Appendix 9.1 Legislation, Policy and Guidance
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 1
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 2
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 3
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 4
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 5
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 6
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 7
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 8
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 9
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 10
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 11
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 12
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 13
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 14
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 15
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 16
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 17
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 18
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 19
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 20
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 21
- PEIR Volume 4 Appendix 9.2 RSK Geosciences Preliminary Risk Assessment Part 22
- PEIR Volume 4 Appendix 9.3 Grid Connection Corridor Techncial Note
- PEIR Volume 4 Appendix 9.4 Scoping Opinion Responses
- PEIR Volume 4 Appendix 10.1 Legislation Policy and Guidance
- PEIR Volume 4 Appendix 10.2 Agricultural Land Classification Report Part1
- PEIR Volume 4 Appendix 10.2 Agricultural Land Classification Report Part2
- PEIR Volume 4 Appendix 10.2 Agricultural Land Classification Report Part3
- PEIR Volume 4 Appendix 10.3. Scoping Opinion Responses
- PEIR Volume 4 Appendix 10.4 Soils and Agriculture Assessment Criteria
- PEIR Volume 4 Appendix 11.1 Legislation Policy and Guidance
- PEIR Volume 4 Appendix 11.2 Scoping Opinion Responses
- PEIR Volume 4 Appendix 11.3 Traffic Data Tables
- PEIR Volume 4 Appendix 12.1 Legislation Policy and Guidance
- PEIR Volume 4 Appendix 12.2 Scoping Opinion Responses
- PEIR Volume 4 Appendix 13.1 Legislation Policy and Guidance
- PEIR Volume 4 Appendix 13.2 Scoping Opinion Responses
- PEIR Volume 4 Appendix 13.3 Construction Dust Assessment Procedures
- PEIR Volume 4 Appendix 13.4 EPUK and IAQM Quality Guidance
- PEIR Volume 4 Appendix 14.1 Legislation Policy and Guidance
- PEIR Volume 4 Appendix 14.2 Scoping Opinion Response
- PEIR Volume 4 Appendix 14.3 PRoW that Intersect the Dev Areas of the GCC
- PEIR Volume 4 Appendix 14.4 Community Facilities within the Surrounding Parishes
- PEIR Volume 4 Appendix 15.1 CC Legislation Planning Policy and Guidance
- PEIR Volume 4 Appendix 15.2 Scoping Opinion Response
- PEIR Volume 4 Appendix 15.3 Methodology for Determining Significance of Effects
- PEIR Volume 4 Appendix 15.4 GHG Footprint Methodology
- PEIR Volume 4 Appendix 16.1 Legislation Policy and Guidance Human Health
- PEIR Volume 4 Appendix 16.2 Scoping Opinion Responses Human Health
- PEIR Volume 4 Appendix 16.3 HIA Method Statement
- PEIR Volume 4 Appendix 16.4 Draft Mineral Safeguarding Statement
- PEIR Volume 4 Appendix 16.5 Legislation Policy and Guidance Waste
- PEIR Volume 4 Appendix 16.6 Scoping Opinion Responses Waste
- PEIR Volume 4 Appendix 16.7 Legislation Policy and Guidance Glint and Glare
- PEIR Volume 4 Appendix 16.8 Scoping Opinion Responses Glint and Glare
- PEIR Volume 4 Appendix 16.9 Legislation, Policy and Guidance Water Resources
- PEIR Volume 4 Appendix 17.1 Legislation Policy and Guidance
Summer Update 2025
Land Access Requests: Frequently Asked Questions
Kingsway EIA Scoping Report:
Stage one consultation materials – 2024
- Stage one newsletter
- Stage one feedback form – printable version
- Stage one land parcel map
- Stage one connection corridor map
- Stage one land parcel map – OS version
- Stage one connection corridor map – OS version
- Stage one ecology
- Stage one environmental constraints
- Stage one heritage
- Stage one hydrology
- Stage one landscape
- Kingsway Solar environmental approach
- Stage one consultation event banners
- Stage one consultation webinar slides
